Can't find it? Send the number and we will source it. Request a quote →

Popular lookups:

How Our Catalytic Converters Are Made

How our catalytic converters are made

One campus, from ceramic substrate to the sealed box. This page shows the machines, the sequence and the checks behind the parts we ship — so you can judge the process before you place an order.

5production workshops on one campus
0.01 mmin-house tooling tolerance
50,000stamped parts per day
100%units inspected before despatch

One plant, start to finish

Substrate firing, catalyst coating, shell forming, robotic welding and final assembly sit inside the same five workshops. Nothing in a Gearonia converter travels to a second plant for a missing step — which is why a batch can be traced back to one coating run and one weld program.

We publish the process rather than a facility tour video because buyers audit suppliers on specifics: which press forms the shell, how the substrate is retained, what happens to a unit that fails a leak test. Those answers are below.

The process, step by step

Nine stations, in the order a converter actually moves through them.

Blanking and stamping
01

Blanking and stamping

409 stainless coil is blanked and formed on 15 pneumatic presses running up to 50,000 stamped parts a day. Shell halves, flanges and brackets come off the same line that fills your order, so wall thickness and radii do not drift between batches.

Laser cutting and 3D trimming
02

Laser cutting and 3D trimming

Blanks from 0.5 mm to 20 mm are cut on fibre lasers holding ±0.05 mm; on carbon steel the head runs 10–30 metres a minute. Three-dimensional trimming is done by FANUC M-20iB robots, so the cut follows the pressed shape instead of a guessed profile.

Tooling and CNC
03

Tooling and CNC

Tooling is machined in-house to 0.01 mm and developed from an original part, not from a drawing alone. That is what keeps sensor ports, flange faces and mounting points where the OE part has them — and why a new reference does not wait six months for a die.

Substrate canning
04

Substrate canning

Ceramic or metallic honeycomb is positioned, clamped and pressed into the shell, with the mounting mat compressed to a specified gap. This single step decides whether a substrate stays put under vibration — the most common failure on cheap replacements.

Robotic welding
05

Robotic welding

Shells, flanges and brackets are welded in OTC robot cells that repeat the same path and current on every unit. Consistent penetration is the difference between a seam that holds and a seam that opens a leak three months down the road.

Coating and baking
06

Coating and baking

Washcoat and precious-metal loading are applied on an automated line — positioning, clamping, coating and high-pressure blow-off in one cycle — then baked. We specify 600-cell ceramic carriers where backpressure allows, and metallic substrate for high-flow references.

Laser marking and traceability
07

Laser marking and traceability

Every unit is laser marked with a batch code before it leaves the line. Quote that code in a fitment or warranty claim and we can pull the coating batch, the weld program and the inspection record for that run.

Incoming material check
08

Incoming material check

Coil and tube are measured on arrival — wall thickness, grade and certificate — before anything is cut. A 1.2 mm shell that should be 1.5 mm is caught here, not by your customer.

Final inspection and packing
09

Final inspection and packing

Hole positions are checked against an OE fixture, every weld seam is inspected, and each box is confirmed to carry its gasket, bolts and sensor plug before it is sealed. We inspect 100% before despatch rather than sampling a batch.

What we check before a part is packed

Five checks that decide whether a converter goes into a box or into the rework bin.

  • Fixture check against original tooling. Mounting holes, flange angle and pipe orientation are compared to an OE sample, not to a drawing — the failure buyers actually see is a part that bolts up but sits 8 mm off the tunnel.
  • Weld seam inspection. Every seam is checked for missed weld and finish before coating; a seam that fails here never reaches a box.
  • Fitment kit check. Gasket, bolts and sensor plug are confirmed in every box, because a missing gasket stops a workshop bay just as effectively as a wrong part.
  • Incoming material check. Wall thickness and steel grade are verified with a calliper and against the mill certificate when the coil arrives.
  • Traceability. The laser-marked batch code on the unit is recorded against its coating run and inspection sheet, so a complaint can be traced to a date and a machine.

Materials we specify

Where a cheaper build is possible, we say what we chose instead and why.

  • 1.5 mm 409 stainless for shells, not 1.2 mm painted carbon steel — the difference shows up as corrosion at the flange after two winters.
  • 600-cell ceramic carrier where backpressure allows; metallic substrate for high-flow and sports references, where a ceramic core would crack.
  • Non-intumescent mat, specified grade, compressed to a controlled gap so the substrate is held without crushing the edges.
  • M18×1.5 sensor ports and OE-matched flange faces, so the original sensor and gasket fit without adapters.
Ceramic and metal substrates in round, oval and racetrack sections — the shape follows the OE part, not a catalogue.
Ceramic and metal substrates in round, oval and racetrack sections — the shape follows the OE part, not a catalogue.

Quality system and documents

The plant runs a quality management system to ISO 9001:2015, with environmental management to ISO 14001:2015 and occupational health and safety to ISO 45001:2018. Automotive quality management follows IATF 16949:2016.

We do not publish certificate scans, certificate numbers or the plant name on this website. Certificates travel with the quotation or the order, and the issuing body can be checked directly from the certificate number once you have it.

Replacement catalytic converters are engineered to the technical requirements of UN/ECE R103. R103 type approval is in progress and expected to be available with orders from 2027; where your destination market requires type approval, we confirm in writing what can be shipped before you order.

Inside the plant

Check a reference before you order

Send the OE number you need. You get the fitment check against the OE sample, the material spec of that reference and a lead time — in writing, within one business day.

Scroll to Top
WhatsApp Facebook